1. Using for thickness: 8-12mm glass, suitable for D19/25mm tube. (Bearing the max weight 80kg, DIA70mm, DIA55mm, DIA44mm.)
2. Materia: AISI 304 or AISI 316 stainless steel to select.
3. Surface treatment: Satin or mirror (polished finished).
Rolling barn door hardware
Rolling barn door hardware
01a
Sliding barn door roller fittings
Sliding barn door roller fittings
1. Using for thickness: 8-12mm glass, suitable for D19/25mm tube. (Bearing the max weight 80kg, DIA70mm, DIA55mm, DIA44mm.)
2. Materia: AISI 304 or AISI 316 stainless steel to select.
3. Surface treatment: Satin or mirror (polished finished).
Barn door hangers
Barn door hangers
1. Using for thickness: 8-12mm glass, suitable for D19/25mm tube. (Bearing the max weight 80kg, DIA70mm, DIA55mm, DIA44mm.)
2. Materia: AISI 304 or AISI 316 stainless steel to select.
3. Surface treatment: Satin or mirror (polished finished).

Top articles

Latest articles

Your browsing history

    Loading...

How to install the sliding door roller?

Categories: Latest EventsStars: 3Stars Visit: - Release time: 2017-10-23 22:18:00
Font size:【 Large Middle Small Source: Editor: Author:

 Door roller is a necessary accessories of installing the sliding door ,it has advantages that convenient, space-saving, repeatable installation and so on.And usually used in the place like bathroom, kitchen, balcony, plant, company.The sliding door system includes hanging door,pipe clamp,stopper,floor guide and hanging rail.

The sliding door roller generally be divided into 2 wheels and 4 wheels of hanging round.In theory, the quantity of sliding door roller depends on how to install of the sliding door, such as single-door only need two rollers,the double-door need four rollers.

How to install the sliding door roller?

1. The spacing of the hanging rail fixing screws is ≤20cm.

2. After the installation of rails must be straight, the top of the hanging rail close to the bottom of the door frame, the bottom of the door frame and the top of the hanging rail should not have gaps to avoid greater vibration and noise;

3. After the support bar is fixed on the door,the height and level of the door can be adjusted by inserting the screw on the connecting screw or the rotating bracket,the best distance is 10mm below the door.

4. The width of the sliding door should be 30-60mm larger than the openings.

5. The door and the door frame does not collide with the gap and the minimum is the best installation position of the stopper.

The locator should be located on the side vertical line of the door.